Inspection after wiring for Spiral Type Sludge Dewatering Equipment Selangor (Environmech Sdn Bhd)

Inspection after wiring
●  Please let professional technical person to check the wire in case it gets electric shock.
●  Make sure tighten the outside binding post in case it causes a fire disaster.


① Make sure the main power and the E-control cabinet power is cut off.

② Please tighten the screws in binding post.

③ Please make sure the operation model is in off state.

④ Turn on the main power.

⑤ Using a multimeter to test whether the voltage in binding post complies with specified voltage or not.

⑥ Turn on the power of E-control cabinet.

⑦ Check whether the power light is on or not.

⑧ Turn on the operation power, control loop power and spray valve power.


For more information or enquiry, please contact Environmech Sdn. Bhd.

Contact us: http://www.environmech.com/p/contact-us.html 

Website: www.Environmech.com